The work under this contract includes approximately 100m of shoreline restoration including, but not limited to:
1. Excavation and removal and disposal of native soil to specified limits;
2. Clearing and grubbing of existing trees in the work area;
3. Relocation of existing trees;
4. Introduction of a new swale;
5. Addition of a new rock berm;
6. .Removal of wharf timber superstructures;
7. Transportation of Riprap 1km from existing stockpile location to project site. Riprap stone to be provided by DFO;
8. Placement of new rip rap to lines and grades as indicated on the project drawings.