North West Redwater Sulfur Recovery Unit

Construction of an 80 ft diameter tank with external concentrate paneling for the North West Redwater Sulfur Recovery Unit. The project involved structural steel erection and welding. • Set up SMAW, FCAW, SAW, gouging and oxy-fuel cutting equipment. • Supervised crane and rigging activities and operated bobcat and zoom boom. • Ensured operating, safety and quality control procedures were followed. • Supervised a crew of 10 to 15 in erection of plate and structural steel.

  • Canada
  • Submitted by Barry Noseworthy