Description |
The work under this contract involves the supply of all labour,
materials, and equipment required to new shore bollards for the
Confederation berth as detailed on the plans and in this specification. The work under this Contract includes but is not limited to:
.1 Mobilization to site of necessary, equipment, materials, tools, site office and personnel to carry out the work as indicated in these tender documents, and demobilization upon completion of the work.
.2 Site work including excavation, demolition and removals of existing concrete bollard structures, hauling and disposal offsite as required.
.3 Supply, installation and maintenance of environmental controls required to complete the work.
.4 Survey required to set location and elevation of new work as indicated on the drawings.
.5 Construction of the two shallow concrete foundation and three (3) pipe bollards; pipe bollards are supplied by the client.
.6 Construction of miscellaneous metals work including stairs, railings and mooring line pipe rails as shown on the drawings.
.7 Reinstatement of existing site features to existing condition.
|